Baxi Eco 3 Wartungshandbuch Seite 23

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 22
9.0 Commissioning the Boiler
23
9.2 Checking the Burner Pressure
1. Turn on the gas and electrical supplies to the
boiler and ensure that all external controls are
calling for heat.
2. Set the hot water and central heating
temperature controls to maximum and the selector
switch to the OFF position (Fig. 42).
3. Slacken the pressure test point sealing screw on
the gas valve and connect a pressure gauge (Fig.
43).
4. Disconnect the sensing tube from the gas valve.
5. Turn the selector switch fully anticlockwise
against the spring pressure to the reset p[osition
and hold for 2 seconds to reset the boiler.
6. Turn the selector switch to the Central Heating
and Domestic Hot Water position ( ). The
power ON light ( ) will illuminate (Fig. 42).
7. Turn on a hot water tap to give a flow rate of at
least 10 l/min.
8. The pressure should be as quoted in Section 4.0
Technical Data. If not, check that the gas supply
pressure is correct (Natural Gas 20mbar, Butane
30mbar and Propane 37mbar).
9. The burner pressure can be adjusted if required.
10. Remove the governor cover screw (Fig. 44)
and adjust the pressure regulator screw until the
maximum pressure is achieved.
11. Turn the boiler selector to the Off position and
remove the plug from the NTC sensor.
12. Turn the boiler selector switch to the Central
Heating and Domestic Hot Water position ( )
and reconnect the plug to the NTC. Check and
adjust as required the minimum pressure (Fig. 43).
This must be performed within 25 seconds after
which the boiler resumes normal operation.
13. Disconnect the pressure gauge, tighten the
pressure test screw and replace the sensing tube
on the gas valve.
14. Replace the governor cover screw and set the
selector switch to the position required.
OUT
MIN
Pressure Test Point
Sealing Screw
Governor Cover Screw
Gas Valve
Central Heating
Temperature Control
Hot Water
Temperature Control
Fig. 42
Fig. 43
Fig. 44
2
1
0
4
3
bar
Selector Switch
Minimum
Pressure
Screw
Seitenansicht 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare