BaxiSolo 2 PFWall Mounted Powered FlueGas Fired Central Heating UnitInstallation and Servicing InstructionsPlease leave these instructions with the us
4.0 Site Requirements104.1 Location1. The appliance may be fitted to any suitable wallwith the flue passing through an outside wall anddischarging to
4.0 Site Requirements114.3 Flue Position (Cont)WARNING - The addition of anything that mayinterfere with the normal operation of theappliance (e.g. FL
4.0 Site Requirements124.5Ventilation of Compartments1. Where the appliance is installed in a cupboardor compartment, no air vents are required.NOTE:
5.0 Installation135.1 Initial Preparation1. Unpack contents of carton.2. Remove the lower door panel from the outercase. Remove the 2 screws holding t
5.0 Installation145.2 Fan Outlet Restrictor (30, 40, 50, 60, 70 and 80)Rear Flue only up to 686mm (27 in) 1. Release the four latches holding thecombu
5.0 Installation155.3 Position the Boiler (Fig. 19)1. Choose a suitable position for the boilermaking necessary allowances for the minimumclearances r
5.0 Installation165.5 Rear Flue Preparation1. Measure the wall thickness (Fig. 22) and to thisdimension add 60mm (23/8in). 2. Take the flue duct and m
5.0 Installation175.6 Assembly of Rear Flue1. Remove the rear air box blanking plate fromthe back plate by releasing the three screws (Fig. 27). 2. Re
5.0 Installation185.7Fitting the Back Plate1. Engage the assembly into the hole previouslycut in the wall and slide in place (Fig. 31). 2. Secure the
5.0 Installation195.8 Left or Right FlueNOTE: If the flue terminal is inaccessible fromoutside the building, it is necessary to fix theinternal fittin
2Baxi Heating Ltd is one of the leading manufacturersof domestic heating products in the UK. Our first priority is to give a high quality service to
5.0 Installation205.9 Side Flue Preparation1. For both Left and Right Hand Flue - Measurethe distance from the wall to the nearest linemarked from the
5.0 Installation215.10 Fitting the Flue and Back Plate1. NOTE: There are two options for fitting theflue and back plate they are:Method A - Fitting th
5.0 Installation225.11 Method A (Cont)7. Engage the assembly into the hole previouslycut in the wall and slide into place. 8. Secure the assembly to t
5.0 Installation235.12 Method B1. Remove the left or right hand air box blankingplate, as appropriate, from the back plate air boxby releasing the thr
5.0 Installation245.13 Terminal Guard1. When codes of practice dictate the use ofterminal guards, they can be obtained from mostplumbers and builders
5.0 Installation255.15 Internal Fitting Kit1. The internal fitting kit (available frommerchants free of charge quoting Baxi Part No. 226441) is suitab
5.0 Installation265.15 Internal Fitting Kit (Cont)6. Refit the end piece to the liner and open out tothe thickness of the wall. Seal the two piecestog
5.0 Installation275.16 Fitting the Combustion Box1. Offer up the combustion box to the back plateand locate the rear bottom edge of thecombustion box
5.0 Installation28NOTE: The method of connection to theelectricity supply must facilitate completeelectrical isolation of the appliance.Connection may
5.0 Installation295.18 Making the Electrical Connections1. Remove the cover from the control box byremoving the 2 screws (Fig. 72).2. Slide the box fo
31.0 Introduction 42.0 Technical Data 53.0 System Details 74.0 Site Requirement 105.0 Installation 136.0 Commissioning the Appliance 317.0 Fitting t
5.0 Installation305.19 Water Connections1. The boiler has two side water connections, thetop connection being FLOW and the bottomconnection being RETU
6.0 Commissioning the Appliance316.1 Commissioning the Appliance1. Flush the whole system in accordance with BS5793:1992 (see Section 3.1 Water Circul
6.0 Commissioning the Appliance326.1 Commissioning the Appliance (Cont)1. From the table opposite check that the mainburner pressure is correct after
7.0 Fitting the Outercase337.1 Fitting the Outercase1. The warning label may be removed unless theboiler is to be fitted within a cupboard.2. Taking t
8.0 Overheat Cut-off Device348.1 Operation1. The overheat cut-off device is of the manualreset type and therefore it is important that theuser knows h
9.0 Annual Servicing359.1 Dismantling the Boiler1. To ensure its continued safe and efficientoperation, it is important that the appliance isregularly
9.0 Annual Servicing369.2 Cleaning the Combustion Box1. Remove the burner assembly by pulling itforward (Fig. 94).2. Lightly brush any dirt from the t
10.0Changing Components37123CentrePinRetainingRivetFig. 98Fig. 99Fig. 100Fig. 101Fig. 102Fig. 10310.1 Changing Components1. When changing components e
10.0Changing Components3810.3 Ignition Electrode (Fig. 104)1. Disconnect the spark electrode lead at theelectrode. 2. Unscrew the electrode from the m
10.0Changing Components3910.7 Changing Components (Cont)1. To change Fan - Pressure Switch - Burner -Burner Injector - Pilot Burner Injector - GasMani
1.0 Introduction4 1STANDARDB.S. 6891B.S. 5546B.S. 5449B.S. 6798B.S. 5440: Pt 1B.S. 5440: Pt 2SCOPEGas Installation.Installation of hot water supplies
10.0Changing Components4010.10 Burner (Fig. 113)1. Remove the burner assembly by pulling itforward.2. Fit new burner and re-assemble all componentsin
1.0 Introduction4111.0 Short parts list444071752524266173664866a7753303923456771a11.1 Short Parts List26Key Description Model G.C. Manuf'rsNoNoPa
12.0Fault Finding42STARTReplace fanReplace harnessReplace pressureswitchReplace fanReplacethermostatDoes fan run ?Is there a clearconstant spark atthe
12.0Fault Finding43Replace the gasvalveReplace PCBBoiler satisfactorySet pressureregulatorDoesthe pilot burnerlight ?Doesthe main burnerlight ?Does th
Baxi Heating LimitedBrownedge RoadBamber Bridge PrestonLancashirePR5 6SNwww.baxiheating.co.ukThe Baxi HelplinesFor General Enquiries+44 (0)1772695555F
2.0 Technical Data1 5Model 30 40 50 60 70 80Heat Output (Max) kW 8.9 11.72 14.65 17.58 20.5 23.45Btu/h 30,000 40,000 50,000 60,000 70,000 80,000Heat O
2.0 Technical Data625751213924394422681441444107 Diawithout internalfitting117 Diawith internalfittingCentre ofGas Connection8 Slots20 x 6Layout of Fi
3.0 System Details7Typical SystemsArrangementOption ABoilerPumpAir VentRadiatorCircuitFully Pumped SystemAirVentRadiatorCircuitTwin ZoneValve SystemAi
3.0 System Details83.3 Pipework1. The sizes of flow and return pipes from theboiler should be determined by normal methods,according to the requiremen
3.0 System Details93.6 Sealed Systems (Fig. 8)1. SAFETY VALVE - A safety valve complyingwith the requirements of BS 6750 Part 1 must befitted close to