© Baxi Heating UK Ltd 2013Platinum Combi HE A RangeGas Fired Wall Mounted CondensingCombination BoilerUser’s Operating Instructions &Important War
10© Baxi Heating UK Ltd 20137.0 Setting the Timer7.1 Setting the TimerThe Electro-Mechanical Timer allows the central heatingsystem to be set every 15
8.0 Emergency11© Baxi Heating UK Ltd 2013Gas TapHeating Flow, HeatingReturn and Mains WaterInlet Isolating ValvesFig.9In an EmergencyIf a water or gas
© Baxi Heating UK Ltd 2013UK Comp No5121650 - Iss 11 - 3/13Information LabelAll descriptions and illustrations provided in this leaflet have been care
2© Baxi Heating UK Ltd 2013© Baxi Heating UK Ltd 2013 All rights reserved. No part of this publication maybe reproduced or transmitted in any form or
1.0 Quick Reference Guide3© Baxi Heating UK Ltd 2013bar0123412345PM78910111212345AM7891011120bar01234ON/OFF/ResetSelector SwitchDisplay Central Heatin
2.0 Troubleshooting4© Baxi Heating UK Ltd 2013STARTMake sure the gas supply isturned ON and check if othergas appliances are operating(e.g. fire, cook
2.0 Troubleshooting5© Baxi Heating UK Ltd 2013Is the Integral Timer ON andcalling for heat ?Ensure timer is set for CentralHeating ON (see Section 7.
3.0 Repressurising System6© Baxi Heating UK Ltd 2013bar01234bar012343.1 Central Heating System Pressure1. The normal operating water pressure is betwe
4.0 Clearances7© Baxi Heating UK Ltd 2013Fig. 4Fig. 5150mm Min*780mm450mm200mm Min(300mm Min ifusing 80/125mmflueing system5mm Min5mm Min450mm MinFor
5.0 Care of the Boiler8© Baxi Heating UK Ltd 20135.1 Cleaning the Outer caseThe painted panels should be wiped with a damp cloth andthen dried complet
6.0 Legislation9© Baxi Heating UK Ltd 20136.1 Installation, Commissioning, Service & Repair1. This appliance must be install in accordance with th
Kommentare zu diesen Handbüchern