Baxi 80e Schnellstart Benutzerhandbuch Seite 25

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 24
10.0 Completion
25
10.1 Completion
1. Hinge the facia panel upwards and refit the
case front panel. Secure them with the screws
previously removed (Fig. 37).
2. Instruct the user in the operation of the boiler
and system, explaining the operational sequence.
3. Carefully read and complete all sections of the
Benchmark Installation, Commissioning and
Service Record Log Book that are relevant to the
appliance and installation. The details of the Log
Book will be required in the event of any warranty
work. The Log Book must be handed to the user
for safe keeping and each subsequent regular
service visit recorded.
4. Hand over the Users Operating, Installation
and Servicing Instructions and the Log Book,
giving advice on the necessity of regular
servicing.
Fig. 37
Facia Panel
Case Front Panel
Seitenansicht 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 43 44

Kommentare zu diesen Handbüchern

Keine Kommentare